< img height="1" width="1" src="https://www.facebook.com/tr?id=383694970908184&ev=PageView &noscript=1"/>
Installation and debugging of gantry shear machine
Source:Hengju Time:2023-10-08 Reading:

The gantry shear machine is an indispensable equipment for large-scale scrap steel recycling. If customers want the gantry shear machine to operate more safely and effectively, choosing a high-quality gantry shear machine is crucial, but the installation and debugging process of the gantry shear machine cannot be ignored. Hengju Machinery provides full process tracking services, and technical personnel provide on-site guidance throughout the installation and debugging process of equipment, only for customers to ensure safe production and avoid detours.

15.jpg

Installation precautions for gantry shear machine:

1. Before installing the gantry shear machine, the installation location should be planned according to the site. A complete set of large-scale scrap steel recycling production lines includes shear machines, conveyors, hosts, feeders, and electrical control cabinets. Therefore, the initial planning is very important, otherwise it will need to be moved back and forth.

2. After planning the installation location, it is necessary to leave pre embedded holes for the foundation bolts.

3. When installing the gantry shear machine, it is necessary to have a solid and reliable concrete foundation; And it should be installed on a flat ground to avoid vibration.

4. Lift the auxiliary agent of the gantry shear machine onto the calibrated position, and then install the motor to ensure that the motor pulley and the host pulley are on the same plane. Then fix them with anchor bolts, otherwise slight vibration may occur during the crushing process.

5. After installing the host and motor, the following small accessories (belt cover, distributor, lubrication system, control system) can be installed in sequence. Be sure to pay attention to the installation accuracy of each component and not ignore the guidance of the manufacturer's technical personnel.

Key points to note during the debugging process of the gantry shear machine:

1. Check whether the quality of the casing and lining plate installed on the gantry shear machine is reliable.

2. Check the quality of the raw materials crushed by the gantry shear machine.

3. Start the lubricating oil pump, observe whether the oscillation of each ammeter is normal, whether the screw runs smoothly, and prepare everything properly before feeding.

4. When debugging the gantry shear machine for the first time, it is necessary to ensure that it is small and uniform. Observe the changes and operation of each ammeter, and clean the impurities on the surface of mineral raw materials. When it reaches normal, gradually increase the amount of material. Pay attention to maintaining relevant clearance and adjust it in a timely manner. Generally, the test run should not be less than 3 hours.